N
|
|
|
|
|
|
|
|
---|
104
| 0.0004 | 0.0011 | 0.0012 | 0.0317 | 0.0005 | 2.81 × 10−7
| 1.32 × 10−6
|
105
| 0.0019 | 0.0042 | 0.0097 | 0.2131 | 0.0044 | 3.61 × 10−7
| 2.51 × 10−6
|
106
| 0.0290 | 0.0245 | 0.0957 | 1.5366 | 0.0431 | 3.85 × 10−7
| 3.32 × 10−6
|
107
| 0.2559 | 0.1897 | 0.8870 | 11.358 | 0.3999 | 4.05 × 10−7
| 2.20 × 10−6
|
- The runs used p = 10 and ϵ = 10−6.25. The timings are given in seconds and refer to, respectively, the tree building; the estimation of f via low-order FMM; the passing up of z, s, min{f}, and ; the dual tree walk; and the passing down of and evaluation of gravity. See also Figure 11.